Exhaust piping installation
What is going on
Exhaust runs under positive pressure and must be sealed completely to keep flue products out of the living space.
Check in this order
- Where pipe passes a joist or wall, make the hole large enough to clear the pipe on all sides.
- Support pipe 5 ft between hangers for schedule 40 PVC, 3 ft for other pipe.
- Isolate the pipe where it exits the wall or roof to stop vibration transfer.
- Route the pipe outside and follow the termination section.
- Slope all horizontal exhaust runs back toward the unit at least 1/4 in. per 12 in. of run.
- Check that there are no sags or low spots in the exhaust piping.
- Glue exhaust pipe to the furnace exhaust fitting.
- If the furnace is in a seasonal home, provide a way to drain condensate from the trap and lines.
Applies to: Exhaust venting on 92G1UH
More furnace guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Allied 92G1UH installation manual, p. 20-21 (PDF p. 20-21). Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.