Allied · Furnace troubleshooting

Exhaust pipe transitions and sizing

A95/A93/95G1/92G1UH

What is going on

Pipe size comes from table 5, and exhaust and intake must be the same diameter. Step-ups should be kept as short as possible. Getting this wrong shows up as pressure switch trips or poor combustion.

Likely causes

  • Pipe diameter not matching table 5 for the model and venting length
  • Intake and exhaust of different diameters
  • Step-up in pipe size placed in a horizontal exhaust run, where condensate can pool
  • Long step-up transition section
  • Loose intake pipe at the inlet air connector

Check in this order

  1. Size the exhaust pipe using table 5 for the model and venting length, because undersized pipe restricts flow.
  2. Use the same diameter for intake and exhaust pipe.
  3. Do not step up from a smaller to a larger pipe in a horizontal run of exhaust pipe, since condensate collects at the step.
  4. If the pipe must step up in size, use the shortest possible length of 2 in. PVC for that transition.
  5. Use transition solvent cement or a sheet metal screw to secure the intake pipe to the inlet air connector.
  6. After assembly, check every joint for gaps and confirm the run slopes back toward the furnace as the manual requires.

Applies to: Upflow and horizontal, direct and non-direct vent exhaust and intake piping

More furnace guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Allied 92G1UH installation instructions manual, p. 24. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.