Daikin · Air handler troubleshooting
ECM motor winding check
What is going on
Checks the three motor phase windings for balance and for shorts to the motor shell.
Likely causes
- Unequal or open phase windings
- Phase winding shorted to motor shell
Check in this order
- Disconnect power and wait 5 minutes for capacitors to discharge.
- Disassemble the motor as in the control/end bell steps.
- At the 3-circuit motor harness, measure resistance between each phase winding. Readings should be equal.
- Replace the motor if readings are unequal, open, or shorted.
- Measure resistance between each phase winding and the motor shell. Replace the motor if any winding is shorted to the shell.
- Reassemble and reinstall the blower assembly.
Applies to: ECM blower motor windings
More air handler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Daikin DX6VS/DZ6VS service instructions SiUS612209EB, p. 19. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.