Bosch · Boiler · Heating

Heating call, anti-cycle and pump post purge

Greenstar 3A

What happens, in order

  1. Call for heat from the control or thermostat
  2. Pump control mode (service function) decides pump behavior: 00 BUS control, 01 pump and burner start together, 03 pump runs continuously, 04 pump only when needed with outdoor reset
  3. Burner fires and heats to the supply setpoint
  4. When the supply goes above the setpoint by the switching differential, burner stops
  5. Fan post purges after the burner shuts off
  6. Anti-cycle timer blocks a restart for the set time
  7. Heating zone pump keeps running for the pump post purge time after the call ends

Timings and thresholds

ItemValue
Anti-cycle time (3.b)0-15 min, default 3 min, 0 = off
Auto anti-cycle (3.A)default off
Switching differential (3.C)default 18 F (10 C)
Fan post purge (5.b)10-180 s, default 30 s
Heating pump post purge (9.F)1-10 min, default 3 min

Applies to: Greenstar 3A series

Models

ZBR 21-3AZBR 42-3AZWB 28-3AZWB 42-3A

More Bosch boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Bosch Greenstar 6721853955 (2025-11) and 6721853953 (2025-11), Heatronic service functions and operation sections. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.