  1. Switch the boiler on with the ON/OFF switch
  2. On the first ever power-up the heating zone pump cycles on and off for about 4 minutes (purging sequence)
  3. On combi models open the automatic vent during this time and close it when it finishes
  4. Condensate trap filling runs when the burner has been idle 28 days or more, after switching between summer and winter mode, or after the ON/OFF switch was used
  5. On the next heat or DHW call the boiler is held at low output for 15 minutes to fill the trap
  6. Display alternates a symbol with the supply temperature while trap filling is active

Timings and thresholds

ItemValue
First purgeabout 4 min
Trap filling run15 min at low output
Trap filling triggerburner idle 28 days

Applies to: Greenstar 3A series

Models

ZBR 21-3AZBR 42-3AZWB 28-3AZWB 42-3A

More Bosch boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Bosch Greenstar 6721853955 (2025-11) and 6721853953 (2025-11), Heatronic service functions and operation sections. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.