Daikin · Water heater troubleshooting
Mount the tank control board and water temperature sensors
What is going on
Controller kit is mounted on a field-supplied hot water storage tank. Sensors are placed at lower (1), middle (2) and upper (3) positions.
Check in this order
- Secure the controller kit onto the field hot water storage tank.
- Install the bracket for the control board with 4 bolts, nuts and flat washers (M12).
- Wrap sealing tape around the thread of each water temperature sensor.
- Screw each sensor into its socket inside the tank (sensors 1 lower, 2 middle, 3 upper).
- Secure the storage box with 4 screws (M4 x 8).
- Secure the storage box cover with 2 self-tapping screws (M4 x 8).
- Handle the sensors carefully because they are precision instruments. Replace any that are dropped or shocked.
Applies to: Controller kit BRP26B2VJU
More water heater guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Daikin Mega-Q installation manual, p. 56. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.