Viessmann · Water heater troubleshooting
Domestic water connections
What is going on
Piping between boiler and tank with service-accessible connections and the required safety devices. Drawing is conceptual only; field piping must be verified by the heating contractor.
Check in this order
- Use detachable fittings for all pipe work.
- Pipe the boiler and tank together, using the factory supplied adaptors so connections are accessible for service.
- Seal unused connections with brass caps.
- Insulate the domestic hot water supply piping.
- Fit a recirculation pump, check valve and time switch on the DHW recirculation pipe, if used.
- Install the required isolation valves, drain valve, pressure reducing valve, water filter, backflow preventer and expansion tank where local code requires them.
- Install a field-supplied anti-scald tempering valve where DHW temperature may exceed local limits or 140°F (60°C).
Applies to: Vitocell 100-V CVWC domestic hot water piping
More water heater guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocell 100-V CVWC installation, service and operating instructions, p. 22-23. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.