Navien · Tankless water heater troubleshooting
Installation checklist: venting
What is going on
Confirm the venting meets the approved materials and layout.
Check in this order
- Confirm the vent uses 3 inch ABS (not cellular core), 3 inch PVC, Navien 4 inch stainless concentric vent kit, or Type BH special gas vent (S636 PVC or stainless steel) for Category IV appliances, or follows this manual and local code.
- Do not use cellular core ABS or PVC pipe as venting for this water heater.
- Do not common vent the water heater with any other appliance or vent stack.
- Slope the vent upward toward the terminal at a 2% grade.
- Support all vent runs and the vent terminal.
- Seal all air intake and exhaust joints from the flue collar to the termination.
- Install vent end caps on the exhaust and intake pipes.
- Check the venting for leakage.
- Keep the vent terminal at least 12 inches above exterior grade.
- Confirm make-up air is sufficient.
- Confirm total vent length is within the stated maximum.
- Run a condensate drain line from the water heater to a floor drain or laundry tub.
Applies to: Installation checklist
More tankless water heater guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien CR-CC installation manual, p. 45. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.