Navien · Tankless water heater troubleshooting
Installation checklist: pressure relief valve
What is going on
Confirm the relief valve is approved and correctly installed.
Check in this order
- Confirm an approved pressure relief valve is installed on the hot water outlet.
- Confirm the valve rating plate shows a BTU level equal to or greater than the maximum BTU rating of the water heater.
- Confirm the valve size matches the requirement on the checklist.
- Install the valve on the hot outlet pipe close to the water heater outlet.
- Run a discharge drain tube from the valve to within 6 to 8 inches of the floor.
Applies to: Installation checklist
More tankless water heater guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien CR-CC installation manual, p. 44. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.