Navien · Tankless water heater troubleshooting

Installation checklist: gas supply

CR / CC

What is going on

Confirm the gas supply is correct and leak-free before startup.

Check in this order

  1. Confirm the gas supply matches the gas type on the rating plate.
  2. Confirm the gas line meets the minimum inner diameter in the manual.
  3. Confirm the gas line length and diameter can deliver the required BTUs.
  4. Measure the gas supply pressure and confirm it is within the specifications section.
  5. Confirm a manual shut-off valve is installed on the gas line.
  6. Pressure test the gas line and check all fittings for leaks.
  7. Confirm the gas company has inspected the installation if required.

Applies to: Installation checklist

More tankless water heater guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien CR-CC installation manual, p. 44. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.