Navien · Tankless water heater troubleshooting

Installation checklist: final handover to owner

CR / CC

What is going on

Brief the owner before leaving the site.

Check in this order

  1. Tell the owner about the minimum flow rate that triggers the burner, if not using a CR-A or CC-A model.
  2. Show the owner how to clean the cold water inlet filter.
  3. Leave the operation and installation manual with the owner.
  4. Show the owner how to shut off the gas in an emergency.
  5. Tell the owner about scalding risk at temperatures above 125°F.

Applies to: Installation checklist

More tankless water heater guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien CR-CC installation manual, p. 46. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.