Carrier · Mini-split troubleshooting

Voltage check at outdoor and indoor units

D5FSHA

What is going on

Measure voltage at the outdoor disconnect, outdoor terminal block and indoor unit during start-up.

Check in this order

  1. Measure 1(L1) to GND, 2(L2) to GND and 1(L1) to 2(L2) at the outdoor disconnect.
  2. Repeat the same checks at the outdoor unit terminal block.
  3. Measure 1(L1) to 2(L2) and 2(L2) to 3(S) at the outdoor unit.
  4. Repeat the checks at the indoor unit voltage check points and record the readings in the start-up checklist.

Applies to: Wiring

More mini-split guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Carrier D5FSHA installation manual, p. 27. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.