Carrier · Mini-split troubleshooting

Start-up checklist: electrical, piping and charge checks

D5FSOAH

What is going on

Items the start-up checklist asks the technician to verify and record for a single-zone ductless system.

Check in this order

  1. Record unit model and serial numbers for the outdoor and indoor units and check that they are compatible.
  2. Record wire size and type, and confirm there are no breaks, splices or wire nuts between outdoor and indoor units.
  3. Check the voltage at the outdoor disconnect, outdoor terminal block, and indoor unit for L1-L2, L1-GND, L2-GND and the signal line (3(S)).
  4. Leak check the system, then hold 500 psig (max. 550 psi) with dry nitrogen for at least 30 minutes.
  5. Evacuate using the triple evacuation method or the deep vacuum method as in the manual, and confirm the system holds 500 microns for 1 hour.
  6. Confirm the line set diameter matches the evaporator connections, and for conventional fan coils confirm it matches the outdoor unit size.
  7. Measure the liquid line length, calculate the additional charge, and record the final charge amount.
  8. Run the system at least 10 minutes at the set point and record T1, T2, T3, T4, Tb, Tp, Th and LA/Lr with the wireless remote Point Check function.
  9. Record any indoor or outdoor error codes present at start-up.

Applies to: D5FSOAH single-zone ductless system

More mini-split guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Carrier D5FSOAH installation manual, p. 26-27. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.