Daikin · Mini-split troubleshooting
Post-repair electrical and drainage checks
What is going on
Checks to finish with before handing the unit back.
Check in this order
- Measure insulation resistance after the repair. It must be 1 MΩ or higher.
- Check the earth/grounding and fix it if the unit is not properly grounded.
- Check that all wiring connections, including soldered and crimped terminals, are secure.
- Check that the terminal cover is fitted so the inter-unit cable cannot lift it off.
- Check the indoor unit drain after the repair.
- Check for refrigerant leaks after charging.
Applies to: All repairs before return to service
More mini-split guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Daikin FTXM-W/V service manual, pp. 9, 14-15. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.