Carrier · Mini-split troubleshooting

Measuring voltage on control boards

D5FSOA

What is going on

Measuring live signals on the board requires the power on. Follow the sequence below and keep the probes correct.

Check in this order

  1. Disconnect main power.
  2. Check the outdoor board first when possible. Remove the outdoor unit top cover.
  3. Reconnect main power and probe the board inputs and outputs with a digital multimeter, using the wiring diagrams.
  4. Connect the red probe to the hot signal and the black probe to ground or negative.
  5. Some DC signals are pulsing. The pulse should move steadily when a signal is present.
  6. To check the indoor board, disconnect main power, remove the front and control box covers, and lay the board face up on a plastic surface.
  7. Reconnect main power and repeat the measurements.

Applies to: Indoor and outdoor PCB

More mini-split guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: D5FSOAH service manual, p. 24. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.