Daikin · Heat pump troubleshooting

Strapping the line set to the structure

DX6VS / DZ6VS FIT

What is going on

Support the line set so it does not rub or touch the structure.

Check in this order

  1. Vertical runs keep the lines off the wall. Use a sleeve through the wall and a strap or wire tie around the gas line, with the liquid line strapped to it.
  2. Horizontal runs strap the gas line to the joist or rafter every 8 ft using metal strapping or heavy nylon tie.
  3. After the gas line is strapped, strap the liquid line to the gas line.
  4. Strap only the gas line where it crosses the joist or rafter so the liquid line stays off the structure.
  5. Anchor all straps securely.

Applies to: Line set routing indoors and through walls

More heat pump guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Daikin DX6VS/DZ6VS outdoor unit installation & service reference, p. 13. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.