Daikin · Heat pump troubleshooting
S-2 Checking wiring
What is going on
Visual and continuity check of field and factory wiring.
Likely causes
- Overheating, damaged insulation or loose connections
- Open wire
Check in this order
- Disconnect all power before servicing or installing.
- Check wiring visually for signs of overheating, damaged insulation and loose connections.
- Use an ohmmeter to check continuity of any suspected open wires.
- If a wire must be replaced, use the same gauge and insulation thickness.
- Do not connect more than two wires into a single terminal in the field.
- Confirm that wires do not come off each terminal after connections are finished.
Applies to: DX6VS / DZ6VS system wiring
More heat pump guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Daikin DX6VS / DZ6VS service instructions SiUS612209EA, p. 15. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.