Carrier · Heat pump troubleshooting
Remove top cover, front right panel, front panel, big handle, rear net and right panel (48K and 60K outdoor unit)
What is going on
Full panel removal sequence for the 48K and 60K sizes. Turn off power before starting.
Check in this order
- Turn off the air conditioner and the power breaker.
- Remove the screws of the top cover, then remove the top cover (7 screws).
- Remove the screws of the front right panel, then remove the front right panel (2 screws).
- Remove the screws of the front panel, then remove the front panel (8 screws).
- For US models, remove the screws of the big handle, then remove the big handle (4 screws).
- Remove the screws of the water collecting cover, then remove the water collecting cover (2 screws).
- Remove the screws of the rear net, then remove the rear net (4 screws).
- Remove the screws of the right panel, then remove the right panel (10 screws).
Applies to: D5CURA 48K and 60K outdoor units
More heat pump guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Carrier D5CURA service manual, p. 75 to 78. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.