Carrier · Heat pump troubleshooting
24K/36K/48K electrical parts and main control board removal
What is going on
Procedure to remove the electronic control box subassembly and the main control board. Anti-static gloves must be worn for this work.
Check in this order
- Wear anti-static gloves.
- Remove the 3 screws of the electronic control box and the 1 screw of the earth wire.
- Disconnect the connectors of the temperature sensor, pump, motor and water level switch.
- Remove the electronic control box subassembly.
- Remove the 2 screws of the main control board and the 2 screws of the earth wire.
- Disconnect the connectors, then remove the main control board.
Applies to: 24K, 36K and 48K indoor units
More heat pump guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: D5FSCAH / D5FLCAH service manual, p. 69. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.