Daikin · Heat pump troubleshooting
Remove panels, side plates and terminal covers (3.5 to 5.0 ton)
What is going on
Take off the outdoor unit panels and covers in order, and disconnect the field wiring before removing the terminal board cover.
Check in this order
- Remove 3 screws and take off the suction grille.
- Remove 9 screws and take off the top panel.
- Remove 1 screw and push down to remove front panel (2).
- Remove 8 screws and take off front panel (1).
- Remove 4 screws and take off the discharge grille.
- Remove 1 screw and take off the terminal board shield plate. This is a 3 class hex head tapping screw; reuse the same screw.
- Disconnect the external power supply, ground and communication wires.
- Remove 4 screws and take off the side cover.
- Remove 5 screws and take off the right side plate. The circled screws are 3 class hex head tapping screws; reuse the same screws.
- If connected, remove 2 screws and separate the conduit tube from the patch plate.
- Remove 1 screw and take off the field wiring plate. This is a 3 class hex head tapping screw; reuse the same screw.
Applies to: 3.5 to 5.0 ton HP & AC
More heat pump guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Daikin SiUS612209EA service instructions, pp. 105-108. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.