Daikin · Heat pump troubleshooting

Remove panels, grille and rear plate (1.5 to 3.0 ton outdoor units)

DX6VSDZ6VS

What is going on

Panel and cover removal for 1.5 to 3.0 ton heat pump and AC outdoor units. Reassemble in reverse order.

Check in this order

  1. Remove the 8 screws and take off the right side panel.
  2. Remove the 4 screws and take off the top panel.
  3. Remove the 5 screws and take off the front panel. When reassembling, hook the front panel into the slit of the partition plate.
  4. Remove the 4 screws and take off the discharge grille.
  5. Cut the 2 clamps, then remove the 3 terminal block screws (1 M5 x 12 and 2 M4 x 10). Disconnect the external power, ground and communication wires from the terminal block.
  6. Remove the 7 screws and take off the rear plate.

Applies to: 1.5 to 3.0 ton HP and AC outdoor units

More heat pump guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Daikin DX6VS/DZ6VS service instructions SiUS612209EA, p. 81-83. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.