Daikin · Heat pump troubleshooting
Remove electrical box, climate talk board and main control board
What is going on
Access sequence for the electrical box and control boards on 1.5 to 3.0 ton heat pump and AC units.
Check in this order
- Remove 1 screw and lift the electrical box off the tube plate. It is held by a hook.
- Remove 2 screws and remove the stay. The stay screws are truss head tapping screws or M4 x 12 truss head machine screws.
- Disconnect the wires on the climate talk board (functional module) and remove the board. When reassembling, curl the wire end and strip it only to the marked point, then tighten to the torque in the control board setting.
- Disconnect all connectors on the main control board.
- Remove 3 screws and take off the electrical component box cover. These are truss head tapping screws or M4 x 12 truss head machine screws.
- Remove the 10 screws and take out the main control board. Tighten each screw group to its torque value on reassembly.
Applies to: DX6VS / DZ6VS outdoor units, 1.5 to 3.0 ton, HP and AC
More heat pump guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Daikin DX6VS/DZ6VS service instructions SiUS612209EB, p. 93-95. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.