Power circuit and field cable requirements

Mega-Q

What is going on

Keep low voltage wiring separated from power wiring to prevent interference.

Check in this order

  1. Apply the rated voltage of 208/230 V.
  2. Install a main switch and a slow blow fuse on each phase.
  3. Keep low voltage wiring (remote controller and between units) at least 2 in. (50 mm) from power wiring.
  4. Secure power wiring to the power terminal block as described in section 7-4.
  5. Secure transmission wiring as described in section 7-3.
  6. Use clamps such as insulation lock ties so wires do not touch piping.
  7. Shape wires so the control box cover is not deformed, then close the cover firmly.

Applies to: Field wiring at heat source and cascade units

More heat pump guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Daikin Mega-Q installation manual, p. 24. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.