Daikin · Heat pump troubleshooting
Outdoor unit: remove electrical box and main control board
What is going on
Removes the refrigerant cooling pipe jacket cover, the electrical box and the main control PCB. Grease and screw specs are in the setting table.
Check in this order
- Remove the 2 screws and the refrigerant cooling pipe jacket cover.
- Remove the old grease and apply new grease as indicated.
- Remove the 2 screws and the electrical box.
- Detach the HPS connectors.
- Disconnect all connectors on the main control board (EEV coil X21A, thermistors X12A, HPS X32A, four-way valve coil X25A, solenoid valve coil X28A, power supply L1/L2, OL X33A, ground E1/E3).
- Remove the 11 screws and take off the main control board and insulation sheet.
Applies to: 3.5 to 5.0 ton HP and AC models; some connectors are HP only
More heat pump guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Daikin SiUS612209EB service instructions, p. 116-117. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.