Daikin · Heat pump troubleshooting
Outdoor cabinet panel removal (3.5 to 5.0 ton)
What is going on
Order for removing the cabinet panels, grilles and covers on 3.5 to 5.0 ton units to reach the internal components.
Check in this order
- Remove 3 screws and take off the suction grille.
- Remove 9 screws and take off the top panel.
- Remove 1 screw, push down, and remove front panel (2).
- Remove 8 screws and take off front panel (1).
- Remove 4 screws and take off the discharge grille.
- Remove 1 screw and take off the terminal board shield plate.
- Disconnect the external power supply, ground and communication wires.
- Remove 4 screws and take off the side cover.
- Remove 5 screws and take off the right side plate. If a conduit tube is connected, remove its 2 screws from the patch plate first.
- Remove 1 screw and take off the field wiring plate.
- To reassemble, reverse the order. Use the same 3 class hex tapping screws where marked. Other screws not listed are hex flanged M5 x 12.
Applies to: 3.5 to 5.0 ton HP & AC outdoor units
More heat pump guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Daikin DX6VS/DZ6VS service instructions SiUS612209EB, pp. 105-108. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.