Daikin · Heat pump troubleshooting
Nitrogen leak test and standing pressure test
What is going on
Never use oxygen, high pressure air or flammable gas for leak testing. The nitrogen cylinder line needs a pressure regulator and a pressure relief valve set to open at no more than 450 PSIG. For a leak test, charge to 10 PSIG with refrigerant, finish charging to working pressure with nitrogen, and check suspect joints with leak detector fluid. For a standing test, hold 450 PSIG nitrogen for at least 4 hours. Repair any leaks and retest.
Check in this order
- Use only dry nitrogen. Never use oxygen, compressed air or flammable gas.
- Fit a regulator and a relief valve set to 450 PSIG or lower on the nitrogen line.
- Charge the system to 10 PSIG with the appropriate refrigerant.
- Finish pressurising to working pressure with nitrogen.
- Apply leak detector to suspect joints.
- For a standing test, hold 450 PSIG nitrogen for at least 4 hours.
- Repair any leaks, then repeat the pressure test.
- Proceed to evacuation and charging only when no leaks remain.
Applies to: DX6VS / DZ6VS / DZ6VSA outdoor units
More heat pump guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Daikin DX6VS/DZ6VS installation manual (3P731493-1), p. 16-17. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.