Daikin · Heat pump troubleshooting
Electrical wiring precautions
What is going on
Field wiring must be done by a licensed electrician to local and national code. The inverter must be grounded properly.
Likely causes
- Reverse phase connection.
- Phase advancing capacitor installed.
- Thermistor or sensor removed during wiring.
- Ground wire connected to gas or sewage pipe.
Check in this order
- Do not install a phase advancing capacitor.
- Ground the unit as required by local and national code. Do not connect ground to gas pipes, sewage pipes, lightning rods, or telephone ground wires.
- Do not remove any thermistor or sensor during power or transmission wiring.
- If reverse phase is found, swap two of the three phases.
- Do not operate the unit until refrigerant piping work is finished.
- Attach a reverse phase or phase loss protection circuit locally if these conditions are possible.
- Use the specified wire and secure it with the supplied clamp. Do not put external force on terminal connections.
Applies to: Power and transmission wiring
More heat pump guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Daikin Mega-Q installation manual, p. 19. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.