Carrier · Heat pump troubleshooting
Decommissioning
What is going on
Remove refrigerant safely and empty the unit before disposal or service.
Check in this order
- Isolate the system electrically.
- Take oil and refrigerant samples if analysis is needed.
- Pump down the system if possible, or use a manifold.
- Recover refrigerant with supervision and do not exceed cylinder pressure.
- Close the equipment isolation valves when done.
- Label the equipment as decommissioned and emptied, with date and signature.
Applies to: Unit decommissioning
More heat pump guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: D5CURA installation manual, p. 6. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.