Carrier · Heat pump troubleshooting
Crossover start-up checklist: voltage checks
What is going on
Record installation data and check supply and communication wiring at each point.
Check in this order
- Record site, contractor, job, distributor, unit model and serial numbers.
- Record wire size and type, and confirm no splices or wire nuts between outdoor and indoor units.
- Confirm wiring from the outdoor port to the correct indoor unit.
- At the outdoor disconnect, measure 1(L1) to GND, 2(L2) to GND and 1(L1) to 2(L2).
- At the outdoor terminal block, repeat 1(L1) to GND, 2(L2) to GND and 1(L1) to 2(L2).
- At the indoor unit, measure 1(L1) to GND, 2(L2) to GND, 1(L1) to 2(L2) and 2(L2) to 3(S).
- Record any notes on the checklist.
Applies to: Outdoor and indoor unit wiring
More heat pump guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: D5CURA installation manual, p. 32. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.