Daikin · Heat pump troubleshooting

Check capacitor residual voltage before touching the inverter area

DX6VSDZ6VS

What is going on

Measure the DC residual voltage on the capacitor before you touch the charged area. Use a multimeter on the DC voltage range. The reading must be 50 V DC or less.

Likely causes

  • The fan blade can spin in wind and recharge the capacitor, which creates a shock hazard.

Check in this order

  1. Shut down the power and wait 10 minutes before opening the control box.
  2. Touch the earth ground terminal first to discharge static from your body and protect the PC board.
  3. Measure DC voltage between C+ and C- at the marked measurement point. Do not touch the charged area while measuring.
  4. Confirm the reading is 50 V or less. Do not touch the charged area until it is.
  5. Right after measuring, disconnect the outdoor fan motor connectors.

Applies to: Units with the C+ and C- capacitor measurement points. The page shows the 1.5-3.0 ton and 2.0 ton Enhanced Capacity model in one view and the 3.5-5.0 ton and 3.0-4.0 ton Enhanced Capacity model in another.

More heat pump guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Installation instructions outdoor unit DX6VS/DZ6VS, p. 39-40. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.