Viessmann · General troubleshooting

Wire the 24VAC DIN rail gateway connections

Versatronik 525 OT/BACIP

What is going on

Connections on the 24VAC DIN rail unit. Terminal labels are partly unreadable in the extracted text.

Check in this order

  1. Connect the BACnet IP RJ45 port to the BMS network.
  2. Wire the OpenTherm 2-wire link to terminals A and B for the boiler.
  3. Connect the field-supplied 24VAC supply to the gateway.

Applies to: Versatronik 525D DIN rail (24VAC)

More general guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Versatronik 525 & 525D OT Communication Gateway BACnet IP manual, p. 8. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.