Viessmann · General troubleshooting
Connect the 120VAC gateway to the control and BMS
What is going on
Overview of the 120VAC unit connections between the solar control, the supplied CAT-5 cable, the BMS and power.
Check in this order
- Plug the supplied CAT-5 cable with RJ45 into the gateway and connect the other end to the solar control.
- Connect the LON communication wiring to the BMS.
- Connect the standard plug-in 120VAC supply to the gateway.
Applies to: Versatronik 531 Solar/LON (120VAC unit) with LON BMS
More general guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Versatronik 531 Solar LON manual, p. 8. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.