Viessmann · General troubleshooting
Connecting the gateway between the solar control and the BMS
What is going on
Wiring sequence for the gateway. Wiring diagrams on pages 8 to 11 were not readable and are not reproduced here.
Check in this order
- Plug the supplied CAT-5 cable with RJ45 ends into the gateway and into the solar control.
- Connect the BMS Modbus RS-485 wires to COM1 terminals A and B. A is (+) non-inverting, B is (-) inverting.
- Apply power 120VAC for the plug-in unit, or 24VAC for the DIN rail unit.
- Set the address dial and the BMS port settings before testing communication.
Applies to: Versatronik 532 Solar/Modbus and 532D Solar/Modbus gateways
More general guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Versatronik 532 Solar/Modbus manual, p. 8-12. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.