Viessmann · General troubleshooting

Connecting the gateway between the solar control and the BMS

Versatronik

What is going on

Wiring sequence for the gateway. Wiring diagrams on pages 8 to 11 were not readable and are not reproduced here.

Check in this order

  1. Plug the supplied CAT-5 cable with RJ45 ends into the gateway and into the solar control.
  2. Connect the BMS Modbus RS-485 wires to COM1 terminals A and B. A is (+) non-inverting, B is (-) inverting.
  3. Apply power 120VAC for the plug-in unit, or 24VAC for the DIN rail unit.
  4. Set the address dial and the BMS port settings before testing communication.

Applies to: Versatronik 532 Solar/Modbus and 532D Solar/Modbus gateways

More general guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Versatronik 532 Solar/Modbus manual, p. 8-12. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.