Viessmann · General troubleshooting

Wire the 120VAC unit to the control and BMS

Versatronik 535 Solar

What is going on

The 120VAC wall unit connects to the solar control with a supplied CAT-5 cable, to the BMS with BACnet IP, and to 120VAC power.

Check in this order

  1. Plug the supplied CAT-5 cable RJ45 into the gateway and the other end into the solar control.
  2. Connect the BACnet IP network to the BMS.
  3. Connect the standard plug-in 120VAC power supply to the gateway.

Applies to: Versatronik 535 Solar/BACIP Wall Mount, 704065

More general guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Versatronik 535 Solar BACnet IP manual, p. 8. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.