Viessmann · General troubleshooting
Wire the 120VAC gateway connections
What is going on
Connections on the 120VAC wall unit. Terminal labels are not clear in the extracted text.
Check in this order
- Connect the OpenTherm 2-wire link to the OT-enabled boiler. Follow the boiler manual for the correct terminal.
- Connect the BACnet IP RJ45 port to the building network.
- Use the plug-in power cord for the 120VAC gateway.
Applies to: Versatronik 525 wall mount (120VAC)
More general guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Versatronik 525 & 525D OT Communication Gateway BACnet IP manual, p. 7. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.