Navien · General troubleshooting
Replacing the power board fuse
What is going on
The power board fuse is mounted on the PCB.
Check in this order
- Turn off the feedwater supply and disconnect power
- Remove the front cover, top cover and power assembly upper case
- Remove the power board fuse from the PCB
- Install the new power board fuse
- Reinstall the upper case, top cover and front cover
Applies to: WEC600
More general guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien WEC600 service manual, p. 88. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.