Replacing the main panel

WEC Series

What is going on

Swap the main panel while keeping the DIP switch configuration of the old panel.

Check in this order

  1. Turn off the feedwater supply and disconnect power
  2. Remove the front cover
  3. Remove the 2 screws from the back and 2 from the front of the top cover
  4. Remove the 4 screws and 4 connectors from the back of the main panel, then remove the main panel from the top cover
  5. Set the DIP switches on the new main panel to match the old one
  6. Insert the new main panel into the top cover, secure with 4 screws and connect the 4 connectors
  7. Reassemble the top cover and front cover as in the power assembly procedure

Applies to: WEC600

More general guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien WEC600 service manual, p. 85-86. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.