Navien · General troubleshooting
Replacing the check valve
What is going on
Remove the back cover and replace the check valve in the outlet water pipe assembly. Protect the O-rings on the adapters.
Check in this order
- Turn off the feedwater supply.
- Disconnect power to the WEC.
- Remove the back cover (see page 82).
- Remove the 4 L-clips from the check valve and Y-adapter, then lift the check valve up and off.
- Insert the O-rings into both adapters and fit the new check valve onto the manifold and Y-adapter.
- Fit the 4 L-clips onto the check valve and Y-adapter.
- Reinstall the back cover and secure it with 11 screws.
Applies to: WEC600
More general guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien WEC service manual, pp. 91-92. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.