Navien · General troubleshooting

Replace the product water solenoid valve

WEC Series

What is going on

Accessed from the back of the unit after the back cover is removed. Keep track of the O-rings on the adapters so they are not lost or damaged.

Check in this order

  1. Turn off the feedwater supply.
  2. Disconnect the power supply from the WEC.
  3. Remove the back cover from the WEC.
  4. Remove the 2 L-clips from the Y-adapter and manifold, then lift the check valve out upward.
  5. From the product/regeneration water pipe assembly, remove the 2 L-clips and connectors.
  6. Pull the product water solenoid valve assembly out of the unit.
  7. Insert the O-rings into both adapters.
  8. Attach the check valve to the manifold and Y-adapter, then install the 2 L-clips.
  9. Place the back cover on the WEC and secure with 11 screws.

Applies to: WEC600

More general guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien WEC service manual, p. 100-101. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.