Navien · General troubleshooting

Replace the CIP circulation solenoid valve

WEC Series

What is going on

Access requires removing the front cover and the CIP tank. When installing, the gray sticker and clip on the valve must face the CIP fitting assembly.

Check in this order

  1. Turn off the feedwater supply.
  2. Disconnect the power supply from the WEC.
  3. Remove the 2 screws on each side of the front cover and set the cover aside.
  4. Remove the 4 screws from the CIP tank assembly and pull the tank out. Avoid spilling the solution.
  5. From the back of the CIP tank, disconnect the water level sensor and CIP dosing pump connectors from the harness.
  6. Remove the three clips and the connector from the product/regeneration water pipe assembly.
  7. Remove the CIP circulation solenoid valve from the unit.
  8. Install the new valve, with the gray sticker and clip facing the CIP fitting assembly.
  9. Install the three clips and the harness connector on the product/regeneration water pipe assembly.
  10. From the back of the CIP tank, reconnect the water level sensor and CIP dosing pump connectors to the harness.
  11. Reinstall the CIP tank with 4 screws.
  12. Align the front cover and secure each side with 2 screws.

Applies to: WEC600

More general guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien WEC service manual, p. 98-99. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.