Reinstalling the CIP tank and top frame

WEC

What is going on

Reconnect the CIP tank, place the top frame and reconnect the harness.

Check in this order

  1. From the back of the CIP tank, connect the water level sensor connector and CIP dosing pump connector to the harness.
  2. Connect the CIP outlet hose to the CIP dosing pump.
  3. Secure 2 clips on the CIP dosing pump, seat the CIP tank into the WEC and secure it with 4 screws.
  4. Place the top frame assembly on the water treatment system.
  5. Connect the circulation pump connector to the harness.
  6. Connect the product/regeneration pipe connector, outlet water pipe connector and NDI module connector to the harness.
  7. Secure 4 screws on the sides of the top frame (2 per side) and 2 screws on the front side of the top frame.

Applies to: WEC600

More general guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien WEC service manual, p. 115. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.