Navien · General troubleshooting
Reinstalling the CIP tank and top frame
What is going on
Reconnect the CIP tank, place the top frame and reconnect the harness.
Check in this order
- From the back of the CIP tank, connect the water level sensor connector and CIP dosing pump connector to the harness.
- Connect the CIP outlet hose to the CIP dosing pump.
- Secure 2 clips on the CIP dosing pump, seat the CIP tank into the WEC and secure it with 4 screws.
- Place the top frame assembly on the water treatment system.
- Connect the circulation pump connector to the harness.
- Connect the product/regeneration pipe connector, outlet water pipe connector and NDI module connector to the harness.
- Secure 4 screws on the sides of the top frame (2 per side) and 2 screws on the front side of the top frame.
Applies to: WEC600
More general guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien WEC service manual, p. 115. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.