Viessmann · General troubleshooting
Prepare the RJ45 communication cable
What is going on
The supplied UTP cable is cut and terminated so only wires 1 and 2 go to the solar control.
Check in this order
- Cut the UTP cable to 2 m.
- Strip the jacket and crimp an RJ45 plug on one end.
- Strip the other end and cut off all wires except wires 1 and 2.
- Strip wires 1 and 2.
- Connect wires 1 and 2 to the solar control.
Applies to: Versatronik 532 Solar/Modbus
More general guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Versatronik 532 Solar Modbus manual, p. 6. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.