What is going on

Confirm the installation before startup. All items should be Yes.

Check in this order

  1. Confirm the WEC is in a suitable location.
  2. Confirm a bypass is installed for service.
  3. Confirm drain tubes have an air gap, length is 197 in. (5 m) or less and height is 10 ft (3 m) or less.
  4. Confirm the NDI freeze prevention drain line is installed.
  5. Confirm the WEC is level with the leveling feet.
  6. Confirm the NaviLink Lite is installed.
  7. Confirm the CIP tank is full.
  8. Confirm the power cord is in a properly installed, grounded outlet that meets code.
  9. Confirm the inlet is connected to the cold-water line.
  10. Confirm feedwater pressure is within specification.
  11. Confirm sediment pre-filter and post carbon block filter are installed properly.
  12. Confirm a check valve and expansion tank are installed for DHW recirculation or storage tank water heaters.
  13. Confirm piping at the sediment filter inlet and carbon block outlet is grounded, with extra grounding on any plastic sections.

Applies to: WEC600

More general guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien WEC service manual, p. 24. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.