Installation checklist
What is going on
Confirm the installation before startup. All items should be Yes.
Check in this order
- Confirm the WEC is in a suitable location.
- Confirm a bypass is installed for service.
- Confirm drain tubes have an air gap, length is 197 in. (5 m) or less and height is 10 ft (3 m) or less.
- Confirm the NDI freeze prevention drain line is installed.
- Confirm the WEC is level with the leveling feet.
- Confirm the NaviLink Lite is installed.
- Confirm the CIP tank is full.
- Confirm the power cord is in a properly installed, grounded outlet that meets code.
- Confirm the inlet is connected to the cold-water line.
- Confirm feedwater pressure is within specification.
- Confirm sediment pre-filter and post carbon block filter are installed properly.
- Confirm a check valve and expansion tank are installed for DHW recirculation or storage tank water heaters.
- Confirm piping at the sediment filter inlet and carbon block outlet is grounded, with extra grounding on any plastic sections.
Applies to: WEC600
More general guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien WEC service manual, p. 24. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.