Viessmann · General troubleshooting
Connecting the gateway to the control, BMS and power
What is going on
Wiring overview for the 120VAC plug-in unit and the 24VAC DIN rail unit. The diagrams on these pages are scrambled, so this follows the numbered callouts.
Check in this order
- Plug the supplied CAT-5 cable with RJ45 into the gateway COM4 port and into the solar control.
- Connect the LON wiring from the gateway LON connections to the BMS.
- Connect power 120VAC to the plug-in unit, or 24VAC to the DIN rail unit.
- Turn off power to the control and damper/blower before servicing.
Applies to: 120VAC plug-in and 24VAC DIN rail units; examples shown for Resol Deltasol BS Plus and Deltasol M
More general guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Versatronik 531 Solar/LON gateway technical information, p. 8-11. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.