Viessmann · General troubleshooting

Connecting the gateway to the control, BMS and power

Versatronik 531 Solar/LON

What is going on

Wiring overview for the 120VAC plug-in unit and the 24VAC DIN rail unit. The diagrams on these pages are scrambled, so this follows the numbered callouts.

Check in this order

  1. Plug the supplied CAT-5 cable with RJ45 into the gateway COM4 port and into the solar control.
  2. Connect the LON wiring from the gateway LON connections to the BMS.
  3. Connect power 120VAC to the plug-in unit, or 24VAC to the DIN rail unit.
  4. Turn off power to the control and damper/blower before servicing.

Applies to: 120VAC plug-in and 24VAC DIN rail units; examples shown for Resol Deltasol BS Plus and Deltasol M

More general guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Versatronik 531 Solar/LON gateway technical information, p. 8-11. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.