34.5 in Chassis ACVC96/AMVC96/GCVC96/GMVC96

What is going on

Heights and sealing for vent and combustion air terminations. Applies to roof and wall. Snow burial and poor seals are the usual faults.

Likely causes

  • Termination below snow level
  • Unsealed roof or wall penetration
  • Coupling and pipe length wrong in wall
  • Pipes in different pressure zones

Check in this order

  1. Terminate at least 12 in above the highest anticipated snow level.
  2. Keep the horizontal termination at least 12 in from grade or snow level.
  3. Seal a roof penetration tight with proper flashing, like a plastic plumbing vent flashing.
  4. For a horizontal wall penetration, install a coupling on each side of the wall and solvent cement a pipe between them. Pipe length equals wall thickness plus socket depth of both fittings.
  5. Seal the wall penetration with silicone caulk.
  6. Terminate both pipes in the same pressure zone (same roof side, no major obstacles between pipes).
  7. Run a cycle and check the seals.

Applies to: Vent/flue and combustion air terminations

More furnace guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Goodman GMVC96 service manual, p. 16. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.