What is going on

Zone valves are used with primary/secondary piping so the boiler loop gets enough flow and the boiler circulator head does not reach the valves.

Check in this order

  1. Pipe the boiler loop with primary/secondary connection tees no more than 12 in. apart.
  2. Keep the boiler loop piping at least the minimum size for the model.
  3. Install isolation valves, purge/drain valves and flow/check valves per the figure.
  4. For a closed-type expansion tank, pipe the tank and make-up water as in the Figure 4 layout.
  5. Strap supply and return sensors to the lines at least 6 pipe diameters, and no more than 3 feet, from the boiler connection tees.

Applies to: Zone valve zoned systems

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Ultra Series 4 boiler manual 550-100-440/1025, p. 52. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.