Zone valve zoning with primary/secondary piping
What is going on
Zone valves are used with primary/secondary piping so the boiler loop gets enough flow and the boiler circulator head does not reach the valves.
Check in this order
- Pipe the boiler loop with primary/secondary connection tees no more than 12 in. apart.
- Keep the boiler loop piping at least the minimum size for the model.
- Install isolation valves, purge/drain valves and flow/check valves per the figure.
- For a closed-type expansion tank, pipe the tank and make-up water as in the Figure 4 layout.
- Strap supply and return sensors to the lines at least 6 pipe diameters, and no more than 3 feet, from the boiler connection tees.
Applies to: Zone valve zoned systems
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- 120 VAC power supply connection to terminal strip T1
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Ultra Series 4 boiler manual 550-100-440/1025, p. 52. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.