120 VAC power supply connection to terminal strip T1
What is going on
Steps for bringing 120 VAC power to the boiler and grounding it.
Check in this order
- Provide and install a properly sized, fused disconnect or service switch as the code requires (15 A in most cases).
- For EVG 220-399, use the load table to confirm the total load before sizing the supply.
- For EVG 110/155, the maximum amp draw is less than 12 A.
- Connect the correctly sized 120 VAC supply wire to the boiler line voltage terminal block T1.
- If possible, add a surge suppressor on the supply line to reduce the chance of control damage from line surges.
- Connect the ground to the boiler ground terminal. Improper grounding can cause abnormal operation and hazards.
Applies to: All Series 2 boilers with terminal strip T1
More boiler guides
- 0-10 VDC output for controlling another heat source (P16 pins 1 and 2)
- 0-10 VDC remote modulation input
- 0-10VDC output for lead/lag and variable speed pump
- A sensor is missing from the list at power-up
- Access and clean exchanger, Ultra-155, -230, -299 and -399
- Access and clean heat exchanger, Ultra-80 and Ultra-105
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain Series 2 advanced manual 550-100-581/0325, p. 48. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.