120 VAC power supply connection to terminal strip T1

Evergreen Pro Series 2

What is going on

Steps for bringing 120 VAC power to the boiler and grounding it.

Check in this order

  1. Provide and install a properly sized, fused disconnect or service switch as the code requires (15 A in most cases).
  2. For EVG 220-399, use the load table to confirm the total load before sizing the supply.
  3. For EVG 110/155, the maximum amp draw is less than 12 A.
  4. Connect the correctly sized 120 VAC supply wire to the boiler line voltage terminal block T1.
  5. If possible, add a surge suppressor on the supply line to reduce the chance of control damage from line surges.
  6. Connect the ground to the boiler ground terminal. Improper grounding can cause abnormal operation and hazards.

Applies to: All Series 2 boilers with terminal strip T1

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Series 2 advanced manual 550-100-581/0325, p. 48. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.