What is going on

Variable flow system with optional DHW piping shown in Figure 17.

Check in this order

  1. Install a system circulator sized for the variable flow and head.
  2. Install a flow/check valve on the boiler outlet to stop gravity circulation during DHW heating.
  3. Optionally add a bypass with a differential pressure valve between near-boiler supply and return. If used, place the System Supply sensor after the bypass.
  4. Install a flow switch if system flow could fall below the minimum flow in Figure 10.
  5. Connect DHW secondary connector piping no more than 8 pipe diameters apart.

Applies to: SVF 1500-3000 Series 1

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF Series 1 boiler manual, p. 20. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.