Weil-McLain · Boiler troubleshooting

Wiring external limits

Evergreen Series 2

What is going on

Two limit types can be wired to J20, depending on whether the boiler should lock out or restart on its own.

Check in this order

  1. Remove the factory jumper at the limit terminals you are using.
  2. For manual reset, wire isolated limit contacts across J20 pins 1 and 2.
  3. For automatic reset, wire isolated limit contacts across J20 pins 3 and 4.
  4. Check the wiring diagram on page 56 for the full layout.

Applies to: Evergreen 110/155/220/299/300/399

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain Series 2 Condensing Gas Boiler Advanced Manual, p. 51. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.