Wire the air handler output (OPU) to the boiler

I-Series Plus

What is going on

Air handler call uses the boiler's OPU output on the zone 3 thermostat connections.

Check in this order

  1. Connect the zone pump for the air handler to Pump 3.
  2. Connect the thermostat to T/T 3.
  3. Wire the OPU output in series with the thermostat W wire, using the normally open, common or normally closed terminal as required.
  4. Set parameter 50 to b to enable the air handler output.
  5. Set parameter 51 to the post-pump run time required (15 seconds default, 40 seconds option).

Applies to: I-Series Plus Condensing Combi Boiler

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 107. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.