Rinnai · Boiler troubleshooting
Wire the air handler output (OPU) to the boiler
What is going on
Air handler call uses the boiler's OPU output on the zone 3 thermostat connections.
Check in this order
- Connect the zone pump for the air handler to Pump 3.
- Connect the thermostat to T/T 3.
- Wire the OPU output in series with the thermostat W wire, using the normally open, common or normally closed terminal as required.
- Set parameter 50 to b to enable the air handler output.
- Set parameter 51 to the post-pump run time required (15 seconds default, 40 seconds option).
Applies to: I-Series Plus Condensing Combi Boiler
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 107. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.